R.C.C. Framed Structure with premixed concrete on footing over the hard strata
2. Walls
9” thick brickwork for outer walls and 4 ½” internal walls
3. Plastering
Plastering with Cement Mortar external walls with sponge finish, internal walls hall, dinning, bedrooms, Kitchen and pooja with lappam finish, Bath rooms & Kitchen utility with sponge finish.
4. Main Door
Main door with Teakwood for Polish
5. Other Doors
Teakwood Frames with teak veneer shutters for polishing
6. Windows
UPVC/ Teak wood frames & Shutters for painting with M.S. grills and glass
7. Painting & polishing
Plastic emulsion for ceiling and walls, snowcem for common areas Oil bound distemper for interiors, snowcem for exteriors, synthetic enamel for wood work and melamine polish for main door.
8. Flooring
Vitrified /Marble flooring /skirting in all areas except bath Rooms. Bath rooms with ceramic tiles.
9. Electrical
Concealed copper wiring with adequate points for A/c, Geysers, exhaust fans, lights fans, T.V. Telephone with Modular Switches of standard make. Three phase incoming with MCBs
10. Toilets:
Glazed Ceramic tiles cladding upto 7’ height. E.W.C& Wash basin of Hindware / or equivalent
11. Utilities
Glazed ceramic tiles and cladding upto 4’height
12. Plumbing & Water Supply
Concealed piping with chrome plated brass fittings.
13. Kitchen
Granite top plot form with 2’ height Glazed ceramic tiles dodo above the platform & stainless steel sink. Provision for exhaust hole, gas cylinder hole
14. Lift
One 8 passengers lift.
15.Generator
Backup Generator for Lifts, common lighting and 8 points for each flat